KitLog pro

Powered By Kitlog Pro v2.0

My Lancair -N992BC IVP Garrett
' style=
Date:  5-19-2005
Number of Hours:  72.00
Manual Reference:  5/19-23/05 w/BD
Brief Description:  Ailerons/flaps/gear door-well

Arrived lunch 3/9/06. Started where I left off on the gear doors. Measured and cut nylon snubber block for each door. Dillard micor'd and sanded the elevator x 4 with good results. Holes cut on posteroir belly behind luggage aea bulkhead. Areas prepped and wire mesh floxed. Cleaned up and reprepped for lay-ups inside floor. Aluminum brackets fab'd for condensore to stand up and ducting fashioned. Flap/aileron gap set and aileron travel adjusted by taking the aileron on and off MANY, MANY times.
' style=

BRRRR its cold

BRRRR its cold

' style=

I hope this works

I hope this works

' style=

Please let me take the aileron on and off one more time!!!

Please let me take the aileron on and off one more time!!!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.