Gear doors were clecoed/screwed in place. Trimmed and rechecked x 10 at least. Elevator was micro'd and body worked x 3. Gear door lay-ups done with subsequent sanding. Control sticks installed . Sticky action. Re shimmed -better. Drag with roll so phenolic wafer in control box was releived and now mich better.