KitLog pro

Powered By Kitlog Pro v2.0

Chucks Lancair 360
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-4-2012
Number of Hours:  2.00
Manual Reference:  Ch 7 & 15
Brief Description:  Installing Pushrods and elevator weldments

Installed Elevator weldments. Installed port elevator with weldment. Measured and started build of the pushrod from the idler arm to the elevator
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.