Powered By Kitlog Pro v2.0
Chucks Lancair 360
360 Mk2
All
8-4-2012
< Previous Log Entry
Next Log Entry >
Date:
8-4-2012
Number of Hours:
2.00
Manual Reference:
Ch 7 & 15
Brief Description:
Installing Pushrods and elevator weldments
Installed Elevator weldments. Installed port elevator with weldment. Measured and started build of the pushrod from the idler arm to the elevator
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
360 Mk2 Home
Category
# Logs
# Hours
All
72
177
Cockpit Interior
18
40
Flight Controls
4
6
Fuselage
9
22
Landing Gear
30
68
Miscellaneous
11
41
Copyright © 2001-2024 Matronics. All Rights Reserved.