Horizontal and Elevators. Verifying the alignment, proper fit, and construction of the horizontal and the hinges. Assembled the elevators and verified alignments. Have to cut a bigger area to allow socket head in to attach weldment to the hinge inside tail. Also have to cut leading edge of the elevators to allow space to insert bolts to attach elevators to the hinges on the tail.