KitLog pro

Powered By Kitlog Pro v2.0

Chucks Lancair 360
' style=
Date:  3-28-2010
Number of Hours:  4.00
Manual Reference:  Ch 7
Brief Description:  Horizontal and Elevators

Horizontal and Elevators. Verifying the alignment, proper fit, and construction of the horizontal and the hinges. Assembled the elevators and verified alignments. I need to cut out the slots on the leading edge of the elevator to allow hardware installation.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.