KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  6-18-2009
Number of Hours:  1.30
Manual Reference:  SNX-F12
Brief Description:  Start of Right Fwd Fuse BuildUp

Located and pilot drilled upper and lower longerons and foward angle. Took a bit of measuring and setup since this was the start of this assy. There was an offset measurement on the upper longeron that had to maintain a consistent distance from the lower skin edge, so it was a case of measure, measure, measure, one cleco, measure again, etc.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.