Brief Description: Start of Right Fwd Fuse BuildUp
Located and pilot drilled upper and lower longerons and foward angle. Took a bit of measuring and setup since this was the start of this assy. There was an offset measurement on the upper longeron that had to maintain a consistent distance from the lower skin edge, so it was a case of measure, measure, measure, one cleco, measure again, etc.