Decided to add SNX-W23-07 tubing attach brackets to right side forward ribs 1-4. Bushings will be installed into the large holes to support the tygon pitot/static lines to be installed during skin installation.
Positioned brackets; drilled to #40 & cleco'd. Up-drilled to #30 and riveted (CCP-42).