KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  4-21-2010
Number of Hours:  0.70
Manual Reference:  SNX-T01
Brief Description:  Finish Vert Stab Hardware

Finished installation of hard-to-reach AN3 hardware securing the vertical stabilizer aft spar to the lower aft fuselage. Torqued hardware.

Tightened and torqued the front spar of the vertical stab-to-horiz stab attachment.

Re-installed rudder. Now I can finish filing the rudder control horn to ensure 25 degrees rudder swing.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.