Spent about an hour going-thru the fuel line fittings both from the main kit as well as the FWF kit to see just what I have WRT my fuel line planning. Still need some "T" fittings to support the dual fuel line (L&R) routing I want.
After I drilled the L-angle flaperon stop brackets, I assembled thje front bearing assembly and the stops onto the AFT torque tube bracket. Checked clearance between the L & R brackets and had to remove them to shave just a few thou' off of the left bracket to provide equal spacing for the two on both sides of the torque tube.