KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  5-22-2019
Number of Hours:  1.50
Manual Reference:  n/a
Brief Description:  Sand left side as prep for 3rd coat

No pics.

Just spent 1.5 hrs sanding the existing paint on the left side, from firewall to tail. Was out of town for 4 days last week, plus drying time for the second coat, then a lot of high humidity and rain days.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.