Brief Description: Finish L-angles for baggage floor
No pics.
Finished cleco-ing the baggage uprights and flaperon control rod covers. Had to cleco-in-place the lower baggage floor and baggage uprights to get the correct spacing.
Had to fabricated L-angles for the right side assemblies.
Once everythingwas in place, I used a 12" bit and pilot-drilled thru the floor holes into the two L-angles fabricated on Monday. Upsided to #30 for A4 rivets.
Dissassembled all. Deburred. Riveted the L-angles (4) to the baggage floor or flaperon control cover as appropriate.
Up-drillled the torque tube channel gussets and cleco'd in place.