Brief Description: Completion tasks right door; final trim & fittings
Went back and forth between doors; read carefully.
Did some more touchup paint on the right door. The on and off turing trim just tore stuff up.
Finished plexi trim on left door; took about 3-4 iterations. While the glass was still on the door frame, positioned and pilot-drilled the center door latch mount to the door frame. updrilled, deburred, and painted.
Left door, enlarged glass rivet holes to 3/16" to allow for thermal expansion. Deburred. Filed glass edges smooth.
Shot some paint on left door in just a small area; will do more later.
On right door, installed the hardware for the front door latch. Located, pilot drilled, updrilled, and riveted the door-side balljoint that connects the door to the pneumatic cylinder to hold the door open. Touched up paint on this door as well.