Ran the brake fluid lines from the pedals thru the console/tunnel and down to the calipers. This is one are where the material supplied by Zenith was the EXACT lenght for both sides!
Ran the pitot-static lines from the bottom of the fuselage supports back thru the tunnel/console to the rough panel area.
General cockpit area cleanup; measured for adel clamps to secure everything, etc.