KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  10-30-2019
Number of Hours:  2.00
Manual Reference:  C75-CA-2
Brief Description:  Fuel Planning / Rear Torque Tube Fitment

Spent about an hour going-thru the fuel line fittings both from the main kit as well as the FWF kit to see just what I have WRT my fuel line planning. Still need some "T" fittings to support the dual fuel line (L&R) routing I want.

After I drilled the L-angle flaperon stop brackets, I assembled thje front bearing assembly and the stops onto the AFT torque tube bracket. Checked clearance between the L & R brackets and had to remove them to shave just a few thou' off of the left bracket to provide equal spacing for the two on both sides of the torque tube.
' style=

Aft side showing flaperon stops

Aft side showing flaperon stops

' style=

Front side with bearing block

Front side with bearing block

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.