Zenith CruZer & Sonex Logs
|
Date: 3-16-2018
|
Number of Hours: 2.30
|
Manual Reference: C75-WA-1
|
Brief Description: Wing details
|
|
a lot of time spent today just piddling around.
Deburred many parts; some needed for the Left wing, some needed now; removed labels with MEK, a razor, and lots of wiping to get the adhesive off.
Positioned the fuel tank spacer angle.
Installed the root rib; up-drilled rear spar attach holes; deburred. Went to attach root nose rib, but my spar is somewhat different; the root angle that is normally up to the builder to form and install came pre-installed on my spar, which would normally be great. However, it sits a lot taller than expected, and the angle is not as sharp as I would have expected, which prevents the root nose rib from seating against the spar. I sent a picture to Zenith to see if they want me to bend it, trim it, or bend and trim.
Worked the spar tip extension quite a bit. This comes pre-drilled to #20, but for the sections that rest on the spar angles (the thick extruded parts), they must be updrilled to #12 for an A6 (a big'un!) rivets. Fortunately, I had 3/16" cleco's the gold ones shown in pic 3 from my prior build, so everything is just fine.
Removed nose rib #7 (3rd from tip) to locate and pilot drill the tie down ring/bracket. This required measuring and clamping the ring bracket to the nose rib, then drilling #40 pilot holes, which were thn up-drilled to #20 final size. It doesn't get riveted until the wing is skinned. No pic.
|
|
fuel tank spacing brackets
|
|
root rib; issue with pre-fab root angle; have asked factory
|
|
Spar tip extension drilled
|
|
|
|
|
|
|
|
|