|
|
|
|
Zenith CruZer & Sonex Logs
|
Date: 2-3-2018
|
Number of Hours: 1.80
|
Manual Reference: C75-TA-2
|
Brief Description: Check Alignment / Rivet Stab Hinge / Start Flapero
|
|
We're having our enclosed patio completely redone, so not much time to do airplane stuff.
Another builder asked if I had any twist issues with my elevator & horizontal stabilizer, and, while I thought I had everything checked-out, I decided to pair them up again and recheck, especially since I had riveted the elevator since they were last paired.
Fortunately, both ends lined up just fine, so all is good. Unfortunately, I then noticed that I had not riveted the hinge position on the horizontal stab. Riveted all those holes.
Dug thru the parts to find flaperon parts. I decided to start with the right side inner flaperon, mostly because it was the same one they used in the Homebuilt Help video. Since there's 4 flaperons, there's a bunch of ribs, nose ribs, and end ribs. Sorted thru the parts and positioned them. Next task will be to debur and remove labels.
|
|
All riveted
|
|
Right Inner Flaperon Parts
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |