Conrads X-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-2-2010
Number of Hours:  6.00
Manual Reference:  45
Brief Description:  Inventory the Final Kit

July 1st, 2010

Today the Final Kit arrived directly to my house via DB Schenker Freight. Weight was exactly 391 lbs and freight cost was 390.52 or 1 dollar per pound from Portland, Oregon. The price was much better than AB Freight line. After taking the kit inventory I found no items were missing (actually for 14.5K you get more parts than I was expecting, aircraft, aerospace parts are very expensive), so now it’s on to building the gull wing doors this weekend. I have read from other builders that I should budget about 100 hours per door so it looks like the rest of the summer will be consumed by chapter 45, Door Building.

Inventory Time 6 hours.
' style=

Final Kit is Dropped Off by DB Schenker Freight (391 lbs.)

Final Kit is Dropped Off by DB Schenker Freight (391 lbs.)

' style=

Upper and Lower Engine Cowlings

Upper and Lower Engine Cowlings

' style=

Lots More Stuff that this in the Box

Lots More Stuff that this in the Box

' style=