KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  8-15-2008
Number of Hours:  1.00
Manual Reference:  Section 10-13
Brief Description:  Tail Cone Section 10-13 Steps 1 to 7

08/15/2008 ….. Steps 1 to 7 accomplished. Fabricated F-1010D and F-1012D using A6-125X3/4X3/4 to the specifications of Figure 1 and Figure 2 Section 10-13. The Final Drilled the F-1010A & B by means of the F-1014. Match Drilled the holes of the F-1011B, F-1011D and F1012D. Time 1 hours
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.