KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  8-11-2008
Number of Hours:  1.00
Manual Reference:  Section 10-10
Brief Description:  Tail Cone Section 10-10 Steps ......

8/11/2008 …..Completed fabricating F-1056 The Rudder Stop found on page 10-10. Added F1037A / B to the Bell Cranks to the F-1029 C Bell Crank Ribs. And added the F-1028 Baggage Bulkhead Channel. Also fabricated F1010-B Spacer created out of a bar of 6061 aluminum. C Clecoed the F-1037 A/B Bell Crank Angles to the F-1029 L/R Bell Crank Ribs. Added F-1014 Aft Deck to the F-1012A/B. Time about 1 hour.
' style=

Tail Cone Sub-Assemblies

Tail Cone Sub-Assemblies

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.