Date:  8-8-2008
Number of Hours:  6.00
Manual Reference:  Section 10-6
Brief Description:  Section 10-6, Steps 1 to 7

8/08/2008 …. Completed steps 1 to 7 today. Found a way to rise the work surface need to 44” above the garage floor (the plans specified at least 38”). Placed all the F-1047 Stiffeners to the Bulk Heads F-1007,F-1008 and F-1010 to the Top Skin F-1078 and side Skin Right F-1073. Then I Match-Drilled all the necessary holes. Time about 6 hours.
' style=

Tail Cone Inverted and 44

Tail Cone Inverted and 44" above Ground Floor

' style=

Bottom of Tail Cone Attached to Bulk Heads

Bottom of Tail Cone Attached to Bulk Heads

' style=

Tail Cone Inverted adn Clecoed

Tail Cone Inverted adn Clecoed