EAA Technical Counselor Vist from EAA #38 Bob Henning. This was my first vist from Chapter #38 EAA technical "check-up". I hasd the following parts checked, Tail cone assem,bly, Horizontal Stabilizer, Vertical Stabilizer, Elevaors both Left adn Right, both Wings, Ailerons and Flaps (on flap was judged only 80% complete). Overall project rated a fully sufful pass. However I need to redo some rivets inthe aft of the tail cone adn install some "pop" MSP-42 blind rivets in the Horizontal Elevaors after talking to Van's tech counsler.