KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  5-6-2009
Number of Hours:  1.00
Manual Reference:  21-6 Step 3 and 4
Brief Description:  Clecoed the end ribs A1005-L and A-1005-R to the M

05/06/2009 … 21-6 Step 3 and 4. Clecoed the end ribs A1005-L and A-1005-R to the Main Ribs using AN426AD3-4 rivets as shown in Figure 3. Then added the Trailing Edge A-1011 to the trailing edge of the Aileron Assembly and clecoing every other hole. Finally removed the cleoes from the upper flanges of A-1005-L and A-1005-R Main Ribs and the A-1004-L Nose Rib and the A-1015-R Inboard Nose Rib in preparation of removing and then flipping the assembly over and begin riveting the assembly as described on Page 21-7. Time only 1 hour for both Ailerons.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.