Brief Description: HE Section 9-15 riveted the sheer clip E-1022 to
07/25/2008 ….Steps 1 to 6. I riveted the sheer clip E-1022 to the close out tabs E-1001 using the blind rivets. After making a slight bend in the leading edge of the top skin E-1001A before riveting. I then rolled the edges before riveting with a 1-1/4” PVC plastic pipe using duct tape. I then final drilled the holes with #30 drill and secured with 41 –ABS pop rivets as called out in the plans. Time about 4 hours.