KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  7-12-2008
Number of Hours:  3.00
Manual Reference:  Page 9-10
Brief Description:  Horizontal Elevator Section 9-10

07/12/2008…..Riveted the Hinge Reinforcement E-910 and the Associated Nut Plate to the E-1002 Front Spar with rivets AN470-AD4-6 and AN470AD4-5 and then completed riveting the Horn WD-605 to the E-905 and E-1002 assembly. Section 9-10. Time 3 hours.
' style=

Horn E-910  Attached to the HS

Horn E-910 Attached to the HS

' style=

Horizontial Elevaor Counter Sinks

Horizontial Elevaor Counter Sinks

' style=

Riveted the Hinge Reinforcement E-910

Riveted the Hinge Reinforcement E-910

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.