KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-3-2008
Number of Hours:  5.00
Manual Reference:  Section 8-14
Brief Description:  Completed Section 8 Horizontal Stabilizer

07/03/2008 …….I have completed the Horizontal Stabilizer or HS section 8-1 to 8-14. Overall I spent about 60m hours on this stage but I not really talking close count of the hours I have spent as I am progressing at a leisurely rate. The HS was not very difficult but I am now not a “rooky riveter” and can select and adjust the air rivet gun with the best of them for blind riveting. Time about 5 hours and about 60 on the HS Stage.
Also to save my ears and the neighbors ears, I moved the air compressor up into my attic and extended a hose, regulator and fitting into my shop area and now no more compressor noise.
' style=

Horziontal Stab is Completed Section 8

Horziontal Stab is Completed Section 8

' style=

HS with DTS Primer/Finisher Paint

HS with DTS Primer/Finisher Paint

' style=

HS Completed

HS Completed

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.