Brief Description: Attached the Leading Edge and Fuel Tank to the Lef
I have attached the Left Outside Leading Edge to the left main spar and the Left pressured checked and tested Fuel Tank to the same left Main Spar. Time about 3 hours due to painting the inside if the leading edge and tank.