KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  10-9-2009
Number of Hours:  8.00
Manual Reference:  29-17 Steps 1 .. 2
Brief Description:  Section 29, FUSELAGE SIDE SKINS …. Pages 29-17, St

Section 29, FUSELAGE SIDE SKINS …. Pages 29-17, Steps 1 to 2

Step 1, I started the task of riveting the Side Skins to the Fuselage. I began as the plan stated by riveting the double row on both sides of the joint between the F-1070 Mid Side Skins and F-1069 Fwd Side Skins.
The continuing riveting the back skin the F-1070 Mid Side Skins using only the rivets called out in figure 1 and figure 2 on page 29-17.

Step 2, After riveting all the called out rivets instep 1 I cleoed the the F-1015C Mid Cabin Decks to both the Left and Right sides.

Time 8 hours.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.