KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  11-29-2008
Number of Hours:  3.00
Manual Reference:  Section14-3
Brief Description:  Section14-3 Flap Hinge Rib W-1025B and Flap Hinge

11/29/2008 …. Page 14-3 riveted the Flap Hinge Rib W-1025B and Flap Hinge Bracket W-1025A to the Inboard Wing Rib W-1011-L both left and right. Then riveted the Torque Tube Support Bracket W-1029B-L Angle W-1029C, Flange Bearings, and Spacers to the above Flap Hinge Rib and Bracket. As described in Figure 4. Section 14-4, Drilled both the 7/16 inch Wire Run Penetration holes and the 5/8 inch diameter Pitot Line Penetration hole using a Uni-bit. (later I would have to add another 5/8 inch hole for the AOA senor that is combined with the Dynon Pitot Tube) This was in preparation for the snap bushing SB-625-7. Time about 3 hours.
' style=

Brackets attached to the Mian Spar

Brackets attached to the Mian Spar

' style=

Tie Down Attached tothe Main Spar

Tie Down Attached tothe Main Spar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.