KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  5-28-2009
Number of Hours:  1.00
Manual Reference:  Upto Section 23
Brief Description:  EAA TECHNICAL COUNSELOR ViISIT

EAA Technical Counselor Vist from EAA #38 Bob Henning. This was my first vist from Chapter #38 EAA technical "check-up". I hasd the following parts checked, Tail cone assem,bly, Horizontal Stabilizer, Vertical Stabilizer, Elevaors both Left adn Right, both Wings, Ailerons and Flaps (on flap was judged only 80% complete). Overall project rated a fully sufful pass. However I need to redo some rivets inthe aft of the tail cone adn install some "pop" MSP-42 blind rivets in the Horizontal Elevaors after talking to Van's tech counsler.
' style=

Side View of the X-10

Side View of the X-10

' style=

E-versionof the Passing X-10 Review

E-versionof the Passing X-10 Review

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.