KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  4-7-2009
Number of Hours:  1.00
Manual Reference:  Section 20 Bottom
Brief Description:  Completed step 1 on page 20-4. For the Right Wing

04/07/2009 … Completed step 1 on page 20-4. For the Right Wing only I installed the following sets of wires. 1) 14 gage white 22759/16 Tensel wire for the Duckworks leading edge 100 watts light. 2) 14 gauge for the Van’s 75 watt outboard fairing tip lights. And when the Whelen Engineering light system LN-SYS6 arrives I have installed a nylon string to pull the wire supple in the installation kit. And yes this all fits with room to spare in the 7/16 inch holes. Time about 1 hour.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.