KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  1-16-2009
Number of Hours:  4.00
Manual Reference:  Page 1 to 4
Brief Description:  Section 18 Fuel Tank, Page 18-2 , Steps 1 to 4

1/16/2008 I completed steps 1 to 4 on page 18-2. Where applicable I used the seamer tool to straighten the fuel tank ribs. Then I fabricated the Tank Stiffners T-1011 by cutting with the band saw as described in Figure 1 saving two T-1008 Vent Line Clips that are found at the end of each set of stiffeners. The using the same technique I formed the Tank Zee Attachments T-1012 by cutting between the notches. The for step 4 I cut to a length of 641/4 inch the J-tank Stiffners for the remaining J-Channel. The I drew a line about 5/16 from the edge the length of the fabricated assembly as a aliment aid in match-drilling. Time about 4 hours.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.