KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  5-2-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Visited Peachtree City Falcon Field Apt for the an

May 1, 2010 ……

Visited Peachtree City Falcon Field Apt for the annual RV Formation Team Fly in. They had about 10 RV’s. An example of each RV including a new certified maroon RV-10 named Gracie. Only a RV-3 and 12 were missing. A free lunch followed and I met another RV-10 builder and he showed me his project in a hanger at the field. He is about 80% complete and has installed a LT-1 Corvette 365 H.P. engine. The installation really looked nice and clean. It was much narrower that the lycomb 540 and about 3 inches longer.


Also, visted Aircraft Spruce and purchased some supplies for my X-10 project at a RV Formation Team Fly in discount of 15%......... : )


Sanded the inside of the Crew Cabin Cover after applying Super-Fil anb allowing it toi dry overnight.
' style=

F.Y.I Thats me standing by Gracie

F.Y.I Thats me standing by Gracie

' style=

Another View of a Exceptional RV-10

Another View of a Exceptional RV-10

' style=

John G. RV-10 with Corvette Engin Instralled

John G. RV-10 with Corvette Engin Instralled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.