KitLog pro

Powered By Kitlog Pro v2.0

Lightning
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-5-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Check fit gear legs I

I have not fitted my spar box, engine mount or gear legs, so I was able to try fitting the gear legs to the appropriate holes today, with no impact of them being attached to the fuselage.

First the bottom weldments: all three went on to within an inch of bottoming with little effort, so I am guessing that when I clean off the paint, they will go fully home.

The main gear legs go into the spar box about 2 inches with some effort . The outside diameter of the top of the main gear legs is 1 3/8". As the tubes are cut off at an angle, I need to get something deeper inside to measure the inside diameter and I don't have a good tool for that. I think something more than removing the paint will have to be done, but this is the next thing I will try.

The nose gear leg will not go into the engine mount at all. The outside diameter of the top of the nose gear leg is 1 3/8". The inside diameter of the tube measures at 1 3/8" too, so no clearance. I think something more than removing the paint will have to be done, but again, this is the next thing I will try.

Arion recognised a quality control problem with the manufacturing of the tubular items which they tell me has now been addressed.

I don't want to remove any material from the engine mount or spar box and leave the tube walls too thin, so if the above does not work, then I will be looking at sanding or turning the top of the gear legs.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.