Made the pushrods - cut to length (didn't have a tube cutter big enough for the large tube - both were cut with the bandsaw and a v block support clamped to a miter fence), primed interior and outside, attached and drilled and riveted rod ends and added bushings. Attached bellcrank, then attached small pushrod from control stick to crank, larger from crank to elevator horns. It was fun moving the elevators from the control stick in the cockpit - I SWEAR I didn't make airplane noises. Really. Next, time to add vertical tail/rudder.