KitLog pro

Powered By Kitlog Pro v2.0

Serenity
' style=
Date:  6-19-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Install of steps, day 1

Started the steps - these are streamlined steel parts that attach by rivets to the side and also by a teflon block inside to a baggage rib. In pic 2, another use of the wonderful 90 degree angle drill attachment - I am drilling a #12 hole (just over 3/16") through the block and torque tube. A bolt here prevents rotation (as do a bunch'o rivets on the flange), then the block is bolted to the rib it sits against.
' style=

Primed

Primed

' style=

Looking down in the fuselage where the torque tube is attached to the rib.

Looking down in the fuselage where the torque tube is attached to the rib.

' style=

Clecoing on the steps

Clecoing on the steps

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.