Attached leading edge, riveted all ribs with Austin's help, then skin to spar. Tank was installed, all bracket to spar bolts done and torqued (40 inch/lbs = 25 plus 15 drag), then the skin was screwed on (the tank has removable fastners so it can be removed even when the plane is done for repair purposes).