Powered By Kitlog Pro v2.0
Serenity
RV-9A
Empennage
11-2-2006
< Previous Log Entry
Next Log Entry >
Date:
11-2-2006
Number of Hours:
3.00
Manual Reference:
Brief Description:
left elevator start
Started left elevator - drilled plates/spar, assebled frame, drilled, assebled counterweight assembly after fluting and straightening ribs.
left elevator plans
assembly, drilling
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-9A Home
Category
# Logs
# Hours
All
416
979
Canopy
22
42
Empennage
54
150
Engine
1
2
Fuselage
196
434
Miscellaneous
7
7
None
1
Shop
4
8
Shop Supplies
1
Tools
5
Wings
125
336
Copyright © 2001-2024 Matronics. All Rights Reserved.