Powered By Kitlog Pro v2.0
Chucks Web Site
RV-7
All
4-1-2012
< Previous Log Entry
Next Log Entry >
Date:
4-1-2012
Number of Hours:
4.00
Manual Reference:
Sec.6 - Drill HS
Brief Description:
Drilled Horizontal Stabilizer (Left)
Removed inboard ribs, fluted, and marked hole locations.
Reinstalled inboard ribs and drilled to size.
Drilled all remaining holes and clecoed skin in place for top and bottom.
Melted plastic strips using soldering iron from protective covering around rivet work area.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
157
562
Ailerons
8
30
Elevator
18
56
Empennage
3
5
Flaps
6
31
Fuel Tanks
29
131
Horizontal Stab
20
49
Leading Edge
2
5
Miscellaneous
1
3
None
1
0
Rudder
10
32
Vertical Stab
4
10
Wings
55
210
Copyright © 2001-2024 Matronics. All Rights Reserved.