Brief Description: Final Drilled LH HS and assy RH HS
Not going to post a picture today, the picture of the Left Hand Horizonal Stab looks like it did before the drilling. Broke the LH HS down and removed blue plastic from the rivet lines. Clecoed the RH HS together fully and will drill it at the next outing. Setting myself up for a marathon deburring and dimpling session with both halfs fo the HS.