Anchored rear boom tube, one side required a little shimming - I think the back is not quite square, but noone will ever see as it is behind some side boom covers. We also installed the bilge pump ss hose clamps and drilled a 7/8" hole for the bilge transition to outside. Then we installed the elevator push tube.
I can tell the boots for the gear are going to be a pain - we'll see if they stick the first time...
Let's see how many clamps I can get around this thing!