KitLog pro

Powered By Kitlog Pro v2.0

SeaRey LSX
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-21-2012
Number of Hours:  3.00
Manual Reference:  None
Brief Description:  Finished Linseed Oil Application and Parts Sorting

Today I finished applying that nasty linseed oil to all the flying surfaces, struts, boom tube, and float parts. I'm still deciding whether to apply to main bulkhead and other parts as they are much less likely to get wet with salt water (I'm not planning to land in salt water.)

I also got ready for first pieces by sorting through all the miscellaneous parts bags and bolts, nuts, washers, specialty parts...

I spent about 3 hours finishing linseed application and another 2-3 hours sorting.

Tomorrow is Thanksgiving, I have so much to be Thankful for!
' style=

Last piece (finally)

Last piece (finally)

' style=

Pieces Parts

Pieces Parts

' style=

Rivets, Bolts, Nuts & Washers

Rivets, Bolts, Nuts & Washers

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.