Riveted the right flap traiing edge and put onto thee right wing with temporary hardware to check fit. Alll looking good with left and right wings/ailerons/flaps.
Closed out the right fuel tank by sealing in and riveting the rear tank baffle. Followed the plans closely with the tank selant application process. The rear baffle is riveted in and then the tank attach Z backets are attached to the baffle with pull rivets. Once all rivets are in, they are covered with tank sealant to hopefully prevent any leaks. Tank will sit at least a week before the final leak testing.