KitLog pro

Powered By Kitlog Pro v2.0

Chris's RV-14A Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  9-12-2018
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Moving part 2

Loaded and moved fuselage to the airport. I borrowed a trailer from the local EAA chapter that many have used to transport planes. It is set up to load tail first to accommodate tail draggers and loading backwards is a little awkward and the result is a poorly balanced load on the trailer with a tri gear. Pulling the plane up the ramps worked out with an electric winch at the trailer tongue and a tow strap wrapped around the gear legs and pulled from the center. 2 person job to load and unload. 38 miles to the airport and stressful drive to say the least!
' style=





' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.