KitLog pro

Powered By Kitlog Pro v2.0

Chris's RV-14A Site
' style=
Date:  7-6-2018
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Inlet ramps

Attached the inlet ramps on the top cowling. These take minimal amout of tweaking to get them to fit then glue them down with epoxy and flox and cleco to hold into place while they dry. Once dry I added some Superfil to the locations in the plans to help seal the ramps to the baffles. This will dry overnight then get final sanded.

Started adding the countersinks to the lower cowling so the Skybolt flanges can be riveted into final position.
' style=

Inlet ramps in place

Inlet ramps in place

' style=

Inlet ramps with filler per plans

Inlet ramps with filler per plans

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.