KitLog pro

Powered By Kitlog Pro v2.0

Chris's RV-14A Site
' style=
Date:  11-2-2017
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Misc firewall fwd

Lots of miscellaneous work today. Installed a central grounding bus on the back of the firewall, this required drilling new mounting holes and moving the battery ground strap to the new attach point. The old nutplate location was just filled with the AN4 bolt and left. Assembled most of the oil cooler with line fittings and then assembly of the mount. Almost finished this assembly, ran oout of clear silicone to glue down some P seals. Installed one piece of baffling to see how much work this will be. Looks like the baffles will not be very difficult to finish up.
' style=

Oil cooler mounting

Oil cooler mounting

' style=

Baffles getting fitted

Baffles getting fitted

' style=

Central grounding mount

Central grounding mount

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.