Powered By Kitlog Pro v2.0
CHRISTIAN'S WEB SITE
RV-8 slow build
All
11-18-2012
< Previous Log Entry
Next Log Entry >
Date:
11-18-2012
Number of Hours:
3.00
Manual Reference:
Brief Description:
pressure leak check of the L.H Tank
the upper water level
the lower water level
the test rig
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 slow build Home
Category
# Logs
# Hours
All
47
373
Empennage
8
57
Miscellaneous
1
3
Wings
38
313
Copyright © 2001-2024 Matronics. All Rights Reserved.