Powered By Kitlog Pro v2.0
CHRISTIAN'S WEB SITE
RV-8 slow build
All
11-2-2012
< Previous Log Entry
Next Log Entry >
Date:
11-2-2012
Number of Hours:
4.00
Manual Reference:
Brief Description:
R.H.fuel tank leak check
Leak check on the R.H.fuel tank ok.Used a water hose as pressure messuring device.
the pressure gauge
72 cm water column, lower level
the upper level of the column
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 slow build Home
Category
# Logs
# Hours
All
47
373
Empennage
8
57
Miscellaneous
1
3
Wings
38
313
Copyright © 2001-2024 Matronics. All Rights Reserved.