KitLog pro

Powered By Kitlog Pro v2.0

Phillips Zodiac is FOR SALE
' style=
Date:  7-23-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  R/H spar upright & Z

Trimmed and drilled the R/H spar upright to fit the fuse and spar.

Made a doubler to move the fuel pass through forward to clear the upright.

Installed the Z diagonal angle forward of the spar.
' style=

The R/H side showing the intersection of the top of the Z angle 1 rivet back from the corner

The R/H side showing the intersection of the top of the Z angle 1 rivet back from the corner

' style=

the L/h side showing the same

the L/h side showing the same

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.