Powered By Kitlog Pro v2.0
Phillips Zodiac is FOR SALE
Zodiac 601 XL
Fuselage upgrade
7-22-2010
< Previous Log Entry
Next Log Entry >
Date:
7-22-2010
Number of Hours:
3.00
Manual Reference:
Brief Description:
L/H spar upright & Z
Trimmed and drilled the L/H spar upright to fit the fuse and spar.
Made a doubler to move the fuel pass through forward to clear the upright.
Installed the Z diagonal angle forward of the spar.
One of the new uprights that I manufactured with a home made press brake to match my spar requirements
.025" doubler and patch to move the fuel pass through further forward
The Z angle set further forward like Zeniths demo plane to make room for a torque wrench
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac 601 XL Home
Category
# Logs
# Hours
All
340
710
650 Canopy
30
68
Avionics
29
58
Back home
1
Controls
14
30
Empennage
8
15
Engine
8
10
Firewall forward
32
70
Fuel system
1
1
Fuselage
19
48
Fuselage upgrade
27
68
Miscellaneous
2
Paint
5
28
Pickup day
2
Prop
1
0
Rudder
6
18
Tools
1
Undercarriage
16
39
Upgrade
58
110
Upholstery
15
24
Wings
7
13
Wings and Upgrade
58
110
Copyright © 2001-2024 Matronics. All Rights Reserved.