KitLog pro

Powered By Kitlog Pro v2.0

Phillips Zodiac is FOR SALE
' style=
Date:  7-22-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  L/H spar upright & Z

Trimmed and drilled the L/H spar upright to fit the fuse and spar.

Made a doubler to move the fuel pass through forward to clear the upright.

Installed the Z diagonal angle forward of the spar.
' style=

One of the new uprights that I manufactured with a home made press brake to match my spar requirements

One of the new uprights that I manufactured with a home made press brake to match my spar requirements

' style=

.025

.025" doubler and patch to move the fuel pass through further forward

' style=

The Z angle set further forward like Zeniths demo plane to make room for a torque wrench

The Z angle set further forward like Zeniths demo plane to make room for a torque wrench

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.